IGNOU MMPC-09 Management of Machines and Materials - Latest Solved Assignment
Get IGNOU MMPC-09 Assignments Soft Copy ready for Download in PDF for (January 2024 – July 2024) in English Language.
- Helps save time and effort-really well
- Promises Good Marks in Less Time
- Answers that are verified and accurate
- Based on IGNOU Guidelines.
BUY MMPC-09 COMBO and Save upto 50%
- Description
- Previous Year Solved Question Papers Included
- Assignments Details
- Assignment Submission End Date
- What's Included
PLEASE MATCH YOUR ASSIGNMENT QUESTIONS ACCORDING TO YOUR SESSION
IGNOU MMPC-09 (January 2024 – July 2024) Assignment Questions
1. There are many stages involved in bringing a new output to the market. Why can’t the stages be performed in a smooth sequence?
2. Identify the information needed for the project crashing. For a project with which you are familiar with, try to identify the various items of information.
3. “It is not surprising that a larger sample does a better job of discriminating between good and bad lots”. Critically examine the above statement.
4. Differentiate between wastivity and productivity. Discuss whether “reducing wastivity” and “increasing productivity” imply one and the samething.
5. Write short notes on any three:
a. Locational break-even analysis
b. Line of Balance (LOB) for Production Control
c. Taxonomy of waste
d. ABC analysis
e. Critical Path Method (CPM)
IGNOU MMPC-09 (January 2023 – July 2023) Assignment Questions
1. “As distinct from intermittent flow processes, all outputs are treated alike in the continuous form of processing and the workflow is thus relatively continuous.” Comment on the statement. Also, explain the characteristics of continuous processes.
2. “Time Management of the project is the first case that is usually done by using Critical Path Method (CPM) and in the second case using Programme Evaluation and Review Techniques (PERT).” Explain, in view of the statement, the critical path method in brief.
3. “Work Design is a systematic investigation of contemplated and present work to formulate through the ideal system concept, the easiest and most effective technique for achieving necessary goals.” Comment on the statement.
4. Waste ‘Management’ is complementary to ‘Resource Management’. Critically comment.
5. What do you understand by the term inventory? Explain the functions of inventory.
MMPC-09 Assignments Details
University | : | IGNOU (Indira Gandhi National Open University) |
Title | : | Management of Machines and Materials |
Language(s) | : | English |
Code | : | MMPC-09 |
Degree | : | |
Subject | : | Management |
Course | : | Core Courses (CC) |
Author | : | Gullybaba.com Panel |
Publisher | : | Gullybaba Publishing House Pvt. Ltd. |