#1 Best Selling IGNOU MMPC-09 Help-Book & Study-Guide in IGNOU Marketplaces.
Get Good Marks in your MBAOM Management Programme in the Term-End Exams even if you are busy in your job or profession.
We've sold over 64,322,009 Help Books and Delivered 81,174,280 Assignments Since 2002.
As our customers will tell you...yes, it really result-oriented.
IGNOU MMPC-09 Code Details
IGNOU MMPC-09 English Topics Covered
Block 1 - Operations Management — An Overview and Facilities Planning
- Unit 1 - Operations Management — An Overview
- Unit 2 - Product Selection and Process Selection
- Unit 3 - Facilities Location
- Unit 4 - Facilities Layout and Material Handling
Block 2 - Operation Planning and Control
- Unit 1 - Planning and Control for Mass Production
- Unit 2 - Planning and Control for Batch Production
- Unit 3 - Planning and Control for Job Shop Production
- Unit 4 - Planning and Control of Projects
Block 3 - Capacity Planning, Work and Job Design & Value Engineering
- Unit 1 - Capacity Planning
- Unit 2 - Work and Job Design
- Unit 3 - Value Engineering and Quality Assurance
Block 4 - Materials Management
- Unit 1 - Purchase System & Procedure and Inventory Management
- Unit 2 - Standardization, Codification and Variety Reduction
- Unit 3 - Waste Management
Buy MMPC-09 Help Book IGNOU MMPC-09 (January 2024 - July 2024) Assignment Questions
1. There are many stages involved in bringing a new output to the market. Why can't the stages be performed in a smooth sequence?
2. Identify the information needed for the project crashing. For a project with which you are familiar with, try to identify the various items of information.
3. “It is not surprising that a larger sample does a better job of discriminating between good and bad lots”. Critically examine the above statement.
4. Differentiate between wastivity and productivity. Discuss whether “reducing wastivity” and “increasing productivity” imply one and the samething.
5. Write short notes on any three:
a. Locational break-even analysis
b. Line of Balance (LOB) for Production Control
c. Taxonomy of waste
d. ABC analysis
e. Critical Path Method (CPM)
IGNOU MMPC-09 (January 2023 - July 2023) Assignment Questions
1. “As distinct from intermittent flow processes, all outputs are treated alike in the continuous form of processing and the workflow is thus relatively continuous.” Comment on the statement. Also, explain the characteristics of continuous processes.
2. “Time Management of the project is the first case that is usually done by using Critical Path Method (CPM) and in the second case using Programme Evaluation and Review Techniques (PERT).” Explain, in view of the statement, the critical path method in brief.
3. “Work Design is a systematic investigation of contemplated and present work to formulate through the ideal system concept, the easiest and most effective technique for achieving necessary goals.” Comment on the statement.
4. Waste ‘Management’ is complementary to ‘Resource Management’. Critically comment.
5. What do you understand by the term inventory? Explain the functions of inventory.
Buy MMPC-09 Assignment
MMPC-09 Previous Years Question Papers